Planning · Kept up to date

The Local Plan
and Kemble.

The draft Cotswold District Local Plan proposes around 1,020 homes south-west of Kemble. This page sets out where things stand, what I think and what I am pressing for. I update it when something changes.

Last updated 13 November 2026 · By Mike McKeown, ward councillor for Kemble

On this pageWhere things standMy viewWhat I have asked forWhat is proposedTimelineQuestions and answersEarlier articlesSources

Where things stand

13 November 2026

The Regulation 19 consultation closed on 3 November, after being extended from 5 October. The next step is for the council to submit the plan, with all the comments received, to the Planning Inspectorate for independent examination. The council had expected to do that around the end of 2026. No examination dates have been published yet.

1 November 2026

I submitted my own response to the consultation. It asks for the number of homes at Kemble and the pace of building to be reconsidered, and sets out the evidence I think is missing. There is a summary below.

19 October 2026

Council Leader Mike Evemy and our MP, Dr Roz Savage, met the housing minister, Baroness Taylor. It was the council's fourth challenge to the Government's housing figure, after three letters. The minister was not prepared to lower the target. She said the district's constraints could be considered at examination and agreed that housing growth must not get ahead of water infrastructure.

Publishing the plan did not grant planning permission for anything. If the Kemble site stays in the plan after examination, developers would still have to apply for permission, with their own evidence, consultation and legal agreements.

My view

I think 1,020 homes is far too many for Kemble. The Government's housing calculation has produced a requirement that is too high for Cotswold District, more than double the previous figure, and it places a disproportionate burden on a small number of communities outside the Cotswolds National Landscape. I said so at Cabinet on 6 August and at Full Council on 12 August 2026.

I nevertheless voted to send the Local Plan to consultation and independent examination. That was not a vote granting planning permission for 1,020 homes, and it was not an endorsement of the number.

A vote against the plan was not a stop button. It would not have removed the housing requirement, stopped the landowner promoting the site or prevented planning applications. Without an up-to-date plan and enough housing land identified for the next five years, the council could have been more exposed to separate applications and appeals, with less control over infrastructure, affordable housing, green space and design.

I chose what I believed was the least-worst route. That does not mean accepting the development as proposed. My job now is to press for the strongest possible protections and to keep you informed honestly. Where something has not yet been secured, I will say so.

What I have asked for

My consultation response, dated 1 November 2026, asks the council and the Inspector to reconsider how many homes Kemble can take and how quickly. It also identifies gaps that I believe must be resolved before the plan is adopted:

  • Kemble station and village traffic. Explain the modest forecast growth in station use against past demand, thousands of extra homes across its catchment and the proposed additional hourly Birmingham to Swindon service. Test parking, access and peak traffic, including traffic diverting through Ewen and Kemble when the main roads are congested, and safety on Windmill Road, Station Road and the approaches to the school.
  • Cirencester parking. Put numbers on the extra parking demand to 2043, after allowing for realistic improvements in buses, walking and cycling, and set out a credible response.
  • Electricity capacity. Obtain clear evidence from the network operator on capacity, reinforcement costs and connection times for homes, heat pumps, electric vehicles and new employment. Existing constraints affecting businesses at the airport show why this needs settling early.
  • Cotswold Airport. Resolve the operational, noise, safeguarding and public-safety questions with the airport and specialist advice. Consulting the Civil Aviation Authority is not the same as its endorsement.
  • Infrastructure and phasing. Identify who delivers what, the costs, the funding and enforceable triggers for roads, crossings, water, wastewater, drainage, schools, healthcare, electricity and green space. If the evidence cannot show acceptable impacts and timely infrastructure, the scale must change.

Beyond the consultation, these are the protections I will keep pressing for:

  • a published phasing plan that ties the number of homes occupied to specific infrastructure being in place;
  • safe crossings and continuous walking and cycling links from the first homes, and full modelling of the A429, the A433 and village routes;
  • written capacity evidence from the water, wastewater and electricity providers;
  • a funded plan for the new primary school and a clear answer on its relationship with Kemble Primary School, plus an assessment of health capacity;
  • protection for ancient woodland, the conservation area's setting and important views, with early planting and proper buffers;
  • affordable homes and a mix that meets local need, including smaller homes;
  • continuing involvement for residents and the parish council in the masterplan and any later applications.

As a councillor I must keep an open mind on any future planning application and judge it on the evidence and the policies in force at the time. Nothing here is a promise to approve or refuse one.

What is proposed

These figures come from the Regulation 19 plan and the council's presentation material. They are proposals, and the detail could change through examination and later applications.

ElementCurrent proposal
HomesAround 1,020, including affordable housing, expected to be built by 2043
Employment landAbout 8.6 to 9 hectares
SchoolLand for a new two-form-entry primary school. Opening date, funding and the relationship with the existing school are still to be clarified
Local centreA mixed-use, village-scale centre. Uses and timing still to be detailed
Green spaceOrchards, play, sports, green corridors and sustainable drainage, including about 18 hectares of natural green space between the main parcels. No development on the land north of the A429
TransportBetter public transport, walking and cycling links, station improvements and links towards Cirencester. Funding, delivery body and triggers still to be set out. Two accesses from the A429 are shown as indicative

At the earlier Regulation 18 consultation, the council estimated around 590 homes would be built on the site by 2043, within a longer-term capacity of about 1,070. The land is broadly the same. What changed is the assumed pace: nearly all of it is now expected within the plan period.

The council's reasoning is that concentrating most growth on a few large sites allows schools, local centres, transport and green space to be planned together, and that around 80% of the district is within the National Landscape, where national policy limits major development. That reasoning does not prove any single site is right. The Inspector will test it.

Timeline

WhenWhat
November 2025 to January 2026Regulation 18 consultation on preferred options
6 August 2026Cabinet considers the Regulation 19 plan. I speak against the scale at Kemble
12 August 2026Full Council votes to publish the plan for consultation
24 August to 3 November 2026Regulation 19 consultation, including public meetings in Kemble and Cirencester
19 October 2026Council Leader and MP meet the housing minister. The target is not reduced
1 November 2026My consultation response
NextSubmission to the Planning Inspectorate, then examination hearings. Dates to be confirmed
LaterThe Inspector's findings, any changes, and a council decision on adoption. A council presentation in September 2026 suggested early 2028

Questions and answers

Did you vote for 1,020 homes?

I voted to publish the whole Local Plan for consultation and independent examination. The plan contains the 1,020-home Kemble allocation, and I said publicly that the number was far too high. Both of those are true. My vote was not planning permission for the site.

Would voting no have stopped it?

No. A vote against would not have removed the Government's housing requirement, stopped the landowner promoting the land or prevented planning applications. It could have delayed or ended that version of the plan. What followed would have depended on later decisions, applications, appeals and national policy, so I can't say exactly what would have happened, only that the pressure would not have gone away.

Is the allocation already planning permission?

No. If the plan is adopted, an allocation gives support in principle. Detailed applications, evidence, consultation, conditions and legal agreements would still be needed.

Why Kemble?

The land was put forward by its owner and assessed through the plan-making process. The council treats Kemble as a principal settlement and considers the site capable of large-scale development, subject to its evidence. The railway station is relevant to how sustainable the site is, but the council has said the site was not chosen under the Government's newer 2026 rules about building near stations. Being near a station does not override problems with roads, landscape, infrastructure or the airport.

Is the infrastructure guaranteed?

No. The plan identifies what is needed and sets policy requirements. Delivery depends on detailed evidence, funding, phasing, legal agreements and decisions by several organisations. My position is that these must become specific and enforceable.

Can the Inspector reduce or remove the Kemble site?

The Inspector examines whether the plan is sound and legally compliant and can recommend changes. Nobody can promise a particular outcome. Comments carry most weight when they point to a specific problem with the evidence or deliverability and suggest a practical remedy.

Why not spread the homes more widely, including inside the National Landscape?

National policy gives great weight to protecting National Landscapes, which limits the options. It does not remove the council's duty to assess alternatives and the effect on the communities outside the designation. That is one of the things the examination should test.

Can residents still have a say?

Yes. The comments made during the consultation go to the Inspector. If the site stays in an adopted plan, every later planning application will be consulted on, and those stages decide the detailed layout, phasing, conditions and obligations.

Earlier articles

These are kept as I wrote them at the time. Dates and timetables in them have moved on.

Cotswold Local Plan: a major proposed change for Kemble, and what happens next (25 July 2026)
Council sets out options to tackle huge government housing targets (8 October 2025)

Sources

Written by Mike McKeown as ward councillor for Kemble. This is my explanation and view, not an official statement from Cotswold District Council.

Contact me about the Local Plan →All articles →